This project consists of replacement of the existing water and wastewater SCADA systems, construction of a sewer lift station, replacement of an existing sewer main, wastewater treatment plant improvements, and appurtenances.
Read MoreThis project consists of replacement of the existing water and wastewater SCADA systems, construction of a sewer lift station, replacement of an existing sewer main, wastewater treatment plant improvements, and appurtenances.
Read MoreConsisting of a Headworks expansion and new screw-type screen, relocation of surface aerators to the aeration basins, new diffused air system in aerobic digesters, new centrifuge sludge dewatering facility, chlorine contact basin weir modifications, site piping, electrical […]
Read MoreNew wastewater treatment facilities including a 20,000-gallon primary septic tank, two 6,500 gallon secondary/equalization tanks, a packaged recirculating textile filter system, a pre-assembled concrete Process Building, cast-in-place foundation, interior piping, valves and appurtenances, sodium hypochlorite disinfection system […]
Read MoreThis project consists of the installation of a secondary clarifier, traveling bridge filter, pumps, blowers, mixers, electrical system, and instrumentation.
Read More