Read MoreDevelop a new municipal city well. To include drilling, pump, piping, electrical, instrumentation, SCADA and backup generator.
Read MoreThis project involves the widening of Buenaventura Boulevard and includes the installation of curb, gutter and sidewalk; asphalt concrete; storm drain; and street lights.
Read MoreThis project consists of replacement of the existing water and wastewater SCADA systems, construction of a sewer lift station, replacement of an existing sewer main, wastewater treatment plant improvements, and appurtenances.
Read MoreThis project consisted of constructing a 200,000-gallon welded steel portable water storage tank, activated carbon filters, SCADA improvements, backup generators, and appurtenances.
Read MoreConsisting of a Headworks expansion and new screw-type screen, relocation of surface aerators to the aeration basins, new diffused air system in aerobic digesters, new centrifuge sludge dewatering facility, chlorine contact basin weir modifications, site piping, electrical […]
Read MoreInstall new Pole Top 12kV Switch, new 12Kv Metal Clad Switchgear, new Duct Bank and Feeders.
Read MoreTheater Drive Pump Station, 1.0 million gallon welded steel tank, approximately 1,400 feet of 16-inch water main, Well 9 manganese filtration system, Supervisory Control and Data Acquisition (SCADA) system improvements at Wells 6, 8 and10, and appurtenances […]
Read MoreInstallation of a 10kW grid tied photovoltaic system and required accessories.
Read MoreNew wastewater treatment facilities including a 20,000-gallon primary septic tank, two 6,500 gallon secondary/equalization tanks, a packaged recirculating textile filter system, a pre-assembled concrete Process Building, cast-in-place foundation, interior piping, valves and appurtenances, sodium hypochlorite disinfection system […]