Oak Bottom Solar Project

New wastewater treatment facilities including a 20,000-gallon primary septic tank, two 6,500 gallon secondary/equalization tanks, a packaged recirculating textile filter system, a pre-assembled concrete Process Building, cast-in-place foundation, interior piping, valves and appurtenances, sodium hypochlorite disinfection system and electrical and mechanical systems to support the process and a new back-up power system including propane generator and interconnecting gas piping.