Bullert Industrial

Projects

Paskenta CSD Emergency Water Treatment…

Design and Upgrade the Controls, Rebuild Valves, and Install new PLC and SCADA.

Read More

Buenaventura Blvd Safety Project

This project involves the widening of Buenaventura Boulevard and includes the installation of curb, gutter and sidewalk; asphalt concrete; storm...

Read More

South Weed Well

Develop a new municipal city well. To include drilling, pump, piping, electrical, instrumentation, SCADA and backup generator.

Read More

Yreka Wastewater Treatment

Consisting of a Headworks expansion and new screw-type screen, relocation of surface aerators to the aeration basins, new diffused air...

Read More

Timber Products 12kV Main Service…

Install new Pole Top 12kV Switch, new 12Kv Metal Clad Switchgear, new Duct Bank and Feeders.

Read More

Oak Bottom Solar Project

Installation of a 10kW grid tied photovoltaic system and required accessories.

Read More

Dunsmuir Wastewater Treatment

This project consists of the installation of a secondary clarifier, traveling bridge filter, pumps, blowers, mixers, electrical system, and instrumentation....

Read More
Skip to content