Walmart DC Climate Control

Project Overview

Market:

Commercial

Sector:

Retail / Distribution

Scope:

Electrical Construction & HVAC Power

Project Details

Electrical Infrastructure for Climate Control Upgrades

Bullert Industrial Electric provided electrical construction supporting climate control upgrades at the Walmart distribution center. The project included electrical demolition, HVAC equipment power, aluminum HVAC feeders, and low-voltage and HVAC pathways required to support the facility improvements.

Bullert’s scope also included limited excavation and backfill, limited saw cutting, and coordination of the electrical infrastructure associated with the climate control work. The project included a Schneider power study, with demolition wiring and conduit removed back to the nearest junction box as required by the project documents.

Project Gallery